Batavia High School
190,180 square foot addition and general remodeling, estimated cost of $61,000,000:
- 12,600 SF classroom addition includes a building trades lab, CADD lab, health classroom, a CADD/Graphics Journalism lab and toilet areas. Estimated cost $2,835,000.
- 19,800 SF classroom addition for 8 general classrooms, science lab and language lab. Estimated cost $4,550,000.
- 7530 SF early childhood teaching area, storage and laptop charging station. Estimated cost of $1,694,000.
- 14,000 SF classroom addition includes 7 general classrooms, science lab, science classroom, and science preparation area. Estimated cost of $3,150,000.
- 5650 SF cafeteria addition; Estimated cost $1,270,000.
- 14,300 SF physical education addition includes a fitness center, varsity locker area addition, and toilet rooms. A physical education teaching station/wrestling room and training room will be created by remodeling existing space. Estimated cost $3,218,000.
- 56,200 SF physical education teaching stations (4)/recreation center includes a six lane track, storage area, four basketball courts, and seating area for 450 people. Estimated cost $6,744,000.
- 8,800 SF recreation center support area includes concession area, toilet rooms, storage, and locker rooms. Estimated cost $1,980,000.
- 17,250 SF performance area includes seating for 875, stage, storage areas, orchestra pit for 40, ticket booth, lobby and coat storage. Estimated cost $7,331,000.
- 12,450 SF drama area includes a scene shop, drama classroom, make-up rooms, dressing rooms, costume storage, toilet rooms, concession area and a conference room. Estimated cost $2,801,000.
- 21,600 SF music areas includes band classroom, orchestra room, and choir room, small practice rooms, music library, uniform storage area, and instrument locker storage. Estimated cost $4,860,000.
- 60,770 SF of remodeling of existing space. Estimate cost of $3,039,000.
- Sitework, estimated cost $4,681,000:
- Excavation
- Parking
- Landscaping
- Sanitary sewer
- Tennis courts
- Water service
- Site lighting
- Storm water detention
- Design contingency, estimated cost $3,216,000.
- Inflation, estimated cost $2,408,000 .
- Fees, permits & testing estimated cost $4,815,000.
- Construction contingency, estimated cost $2,408,000.
Rotolo Middle School
Auxiliary Gym Space at at a cost of $2,275,000
- 7000 SF addition includes auxiliary gymnasium, circulation space and a physical education lobby area. Estimated cost $2,275,000.
Early Childhood Center
A core Early Childhood Center constructed on the Alice Gustafson School campus and remodeling of the Early Childhood classrooms at Grace McWayne into three regular classrooms. Estimated total cost $5,325,000.
- 15,000 SF addition on the Alice Gustafson site includes 6 early childhood classrooms, a motor room, office area, and bathrooms in each classroom. Estimated cost $4,875,000
- One additional classroom for Alice Gustafson School
- Demolition and remodeling of 3500SF of the existing early childhood center and construction of 3 standard classrooms and one itinerant room. Estimated cost $450,000
HVAC Replacement and Masonry Repairs
HVAC Replacement and Masonry Repairs to H. C. Storm School and Louise White School at a cost $4,500,000
- Heating and Cooling replace at Louise White: $2,000,000
- Heating and Cooling replace at H.C. Storm: $2,000,000
- Masonry tuck-pointing at Louise White: $250,000
- Masonry tuck-pointing at H.C. Storm $250,000
Classroom Casework Replacement
Classroom casework replacement at Alice Gustafson and J. B. Nelson at a cost $600,000.
- Classroom casework replacement at J.B. Nelson $300,000
- Classroom casework replacement at Alice Gustafson $300,000
Surveillance and Controlled Access Systems
District-wide (all buildings) safety systems for surveillance and controlled access at a cost of $1,300,000
- Surveillance system for all buildings $800,000
- Exterior access system $500,000