Facilities Referendum

On April 17th, voters will be asked to authorize the proposition to issue bonds for $75 million dollars. If approved, the referendum would provide the following improvements throughout the District:

Facilities Summary
Batavia High School
  • 16 Standard classrooms
  • 9 Specialized classrooms
    • Building trades lab
    • CADD lab
    • CADD/Graphics Journalism lab
    • early childhood teaching area
    • drama room
    • band room
    • orchestra room
    • choir room
    • science room
  • Auditorium
  • 5 PE/Fitness stations
  • 31 Total teaching stations to be constructed
    • + 3 specialized lab spaces
      • language lab
      • 2 science labs
  • Surveillence system
  • Exterior access system
Rotolo Middle School
  • Auxiliary gymnasium, circulation space and a physical education lobby area
  • Surveillence system
  • Exterior access system
Alice Gustafson School
  • Early Childhood Center
  • One additional classroom
  • Classroom casework replacement
  • Surveillence system
  • Exterior access system
H.C. Storm School
  • HVAC replacement
  • Masonry repairs
  • Surveillence system
  • Exterior access system
Louise White School
  • HVAC replacement
  • Masonry repairs
  • Surveillence system
  • Exterior access system
J.B. Nelson School
  • Classroom casework replacement
  • Surveillence system
  • Exterior access system
Grace McWayne School
  • Surveillence system
  • Exterior access system
Hoover-Wood School
  • Surveillence system
  • Exterior access system